Photo Stories

Our mission is to be the most respected ready-mix concrete supplier in each market we serve.
As such, our focus is on:
• Superior Quality – The highest level of quality is a continual pursuit.
• Responsive Customer Service – Our customers expect a level of service that is second to none.
• Employee Enhancement – Our greatest resource is our employees.
• Financial Stability – Consistent profitability is the basis for the continued existence of our company.

With each load of concrete delivered to our customers, our employees participate in laying the foundation of this great land of ours called America and to help fulfill dreams for each of her citizens.

Lamar is our Plant Foreman at Longview Asphalt Plant, Saginaw Alabama.

In 2012 Topre America in Cullman, AL partnered with Dunn Building Company on a Design-Build project to construct a total of 7 presses and associated tunnels to increase Topre’s manufacturing capacity by 40%. To meet their aggressive schedule, DBC worked 2ea 10hr shifts to finish within their 4-month schedule. The project was a huge success with avoiding existing operation interruptions, preventing no dust to enter the plant, and completing under budget. Over 20,000 cu yds. of soils were excavated, 6,000 cu yds. of concrete poured, 550 tons of rebar installed, and over 40,000 man-hours worked. The project received numerous awards and has allowed DBC continued other work with Topre since.

Our picture was taken During the excavation of the Bridgestone Office building in Nashville TN. That Beautiful Flag flew while approximately 55,000 cubic yards of solid rock was excavated and nearly 8,000 truckloads of material were hauled off site.

HPS was paving Site 3 of a multi-site safety improvement project on SR 43 in Pearl River County with MDOT, roughly $6m.

Dunn Roadbuilders, LLC – In this photo, our equipment is loading dirt from a pit. Road construction begins with dirt as the foundational basis. The additional layers of stone and asphalt are laid to create infrastructure used in daily travel.

The DUP picture in this collage is of our Project Manager, Bruce Thomas. When we have finished product leave our yard, we spray paint our logo on multiple pieces, if not all the pieces. The reference picture is him spraying our logo on some square concrete structures that are about to leave our yard